Construction Administration

Atchison 15th Street Storm Improvements

The City of Atchison had combined sanitary/storm sewers (CSS). Dry period wastewater flows flow uneventfully directly to the wastewater treatment plant. Rainfall contributed stormwater runoff to the CSS. The resulting combined flows can exceed the collection system capacity and the City is treating stormwater runoff at the wastewater treatment. During wet times the City was producing CSS overflows. The City is under Kansas Department of Health and Environment mandate to separate CSS flows to reduce or eliminate combined sewer overflows. 

Manhattan North Campus Corridor Detention

The North Campus Corridor Detention project consisted of the design and construction of two individual detention basins north of Kimball Avenue between College Avenue and Denison Avenue. The basins were designed in order to reduce the proposed flow as a result of future development along the Kimball Avenue corridor. The basins resulted in a total impoundment area of 13.76 acres for the 100-year storm frequency.

City of Emporia Lift Station #2 Improvements

City of Emporia contracted with BG Consultants, Inc. to evaluate three lift stations in their sanitary sewer collection system. Included in these were stations 1 and 2, two of the largest stations in the system, both capable of pumping in excess of 1,600 gallons per minute. Lift Station 2 was submitted for grant funding to the Kansas Department of Commerce - Community Development Block Grant (CDBG) program and received $700,000 in grant funding.

Control Service Company New Office

BG Consultants, Inc. partnered with BHS Construction on a design-build delivery for the new Control Service Company office. The 3,045 SF facility was constructed using wood-frame construction and provides a highly functional and efficient workspace tailored to the client’s operations. BG provided a full range of in-house services, including architectural design, structural engineering, MEP engineering, civil engineering, surveying, and construction staking.

Horton Wastewater Treatment Facility Improvements

In 2015 BG was contracted to assist the City of Horton with improvements to their Wastewater Treatment Facility due to effluent permit limitation violations with the Kansas Department of Health and Environment. After conducting a study that identified options for improvement and replacement, it was concluded that replacement was the best option due to the existing facilities' condition.

Westport Commons Commercial Development

BG Consultants worked with Schultz Construction to design a commercial Planned Unit Development (PUD) in Manhattan, intended to accommodate growing demand for professional and outpatient care offices. Over a multi-phase project, BG has provided a full range of architectural and engineering services. To date, our team has designed the core and shell for seven buildings and the associated parking lots, grading, and water, wastewater, and stormwater systems.